Rebuilding the interior
My work has been slow this week. With the details of the cabinets inside the trailer, it has taken more time than expected. The kitchen is coming together and I have been able to add more drawer space by compacting the plumbing tight against the side wall. We increase the power of the water pump. As you can see from the picture the existing pump was nothing more than a cheep aquarium pump. I used "Pex" plastic tubing for the water lines. The fittings are very easy to set up.
I boxed around the sink drain for more drawer space. I added a cutting board under the counter above the drawer to the right of the sink.
I have been working on the forward bunk area this week. The fresh water tank is under the lower bunk and the demand pump is on the front left side next to the water heater. Both the upper and lower bunks are about 42 inches deep. at the end of the lower bunk is a small storage pocket for books and things.